Skip to content
Compliance & Safety

RAMS Explained: Risk Assessments and Method Statements

A plain-English guide to risk assessments and method statements for tradespeople — what they are, when you need them and how to write them.

The Complete Tool Team ·

You turn up to price a commercial job and the facilities manager asks for your RAMS before you can even step on site. If you’ve only ever worked domestic, that one word can stop a good earner dead. The good news is RAMS aren’t complicated once you strip the jargon away — and having them ready can be the difference between winning the contract and losing it to the firm next door.

What RAMS Actually Means

RAMS stands for Risk Assessment and Method Statement. It’s two documents that usually travel together:

  • A risk assessment identifies what could go wrong on a job, who might get hurt and what you’ll do to reduce the danger.
  • A method statement describes, step by step, how you’ll carry out the work safely.

Think of the risk assessment as what the hazards are and the method statement as how you’ll deal with them. Together they prove you’ve thought about safety before you pick up a tool, not after something goes wrong.

For larger sites and commercial clients, RAMS are often a condition of getting through the gate. Principal contractors need them on file to meet their own duties, so no RAMS usually means no job.

When Do You Actually Need RAMS?

Not every domestic boiler service needs a formal RAMS pack. But you’ll typically be asked for one when:

  • You’re working on a commercial or industrial site, especially as a subcontractor under a principal contractor.
  • The job involves higher-risk work — working at height, hot works, confined spaces, asbestos, live electrical work or heavy lifting.
  • A client, letting agent, housing association or main contractor requests them as part of pre-qualification.
  • The work falls under construction regulations where a contractor has to demonstrate safe systems of work.

Even on smaller jobs, a short risk assessment is good practice. UK health and safety law expects employers and the self-employed to assess risks to themselves and anyone affected by their work. The exact requirements change depending on the work and your set-up, so check the current official HSE guidance rather than relying on a rule of thumb you heard on site.

Tip: Keep a folder of reusable RAMS templates for the job types you do most — EICRs, boiler swaps, tree felling, consumer unit changes. You’re tailoring a base document each time, not starting from scratch.

How to Write a Risk Assessment

A solid risk assessment doesn’t need to be a thesis. Work through five plain steps:

  1. Identify the hazards. Walk the job in your head. Electric shock, falls from height, dust, manual handling, slips, vehicles, members of the public.
  2. Decide who might be harmed and how. You, your team, the customer, other trades on site, passers-by.
  3. Evaluate the risk and decide on controls. What will you do to remove or reduce each hazard? Isolate the supply, use edge protection, wear the right PPE, cordon off the area.
  4. Record your findings. Write it down clearly. If you employ people, recording it is generally expected — again, check the current rules for your situation.
  5. Review and update. Site conditions change. Revisit the assessment if the job changes or something nearly goes wrong.

Keep the language specific. “Be careful working at height” tells a site manager nothing. “Use a tower scaffold with guard rails for work above two metres; no ladder work for the gable install” shows you mean it.

How to Write a Method Statement

The method statement is your safe sequence of work, written so anyone could follow it. A practical structure:

  • Job and site details — address, client, dates, who’s doing the work.
  • The team — names, roles and relevant tickets or qualifications.
  • Step-by-step method — the order you’ll do the work, with the safety control built into each step.
  • Tools, plant and materials — what you’re using and any inspection or certification it needs.
  • PPE and emergency arrangements — first aid, nearest hospital, who to call.
  • Sign-off — space for the team to confirm they’ve read and understood it (the “toolbox talk” record).

Tie it back to the risk assessment. If your assessment flags falls from height, your method statement should spell out exactly how the access equipment removes that risk. The two documents should never contradict each other.

Making RAMS Part of How You Win Work

Here’s the part most tradespeople miss: RAMS aren’t just a hoop to jump through. A tidy, professional RAMS pack signals that you’re organised, insured and serious — exactly the impression you want when you’re quoting against cheaper competitors. Buyers notice.

The admin is where it falls down. Re-typing the same method statement, hunting for last year’s risk assessment, emailing certificates one at a time — that’s hours you’re not billing. This is where a job-management system earns its keep: store your RAMS templates, attach them to the job, and send them with your quote in a couple of taps. Pair that with a quote that goes out the same day and you look sharper than firms still working off a clipboard.

Keeping every document in one place also pays off when an audit or insurer comes knocking. If you want a system for that, see our guide on storing certificates and staying audit-ready. With Complete Tool, the paperwork lives against the job, not in a glovebox or a buried email thread.

Common Mistakes to Avoid

  • Generic, copy-paste RAMS. A site manager can spot a template you didn’t tailor. Make it specific to the actual job.
  • Writing them and never reading them. RAMS only protect you if the team has actually been briefed.
  • Letting them go stale. A risk assessment from two years ago for a different property won’t hold up.
  • Forgetting the public. On domestic and street-facing work, passers-by and the customer’s family are people who could be harmed.
  • No version control. If you can’t quickly produce the version you used on the day, you’ve lost the paper trail that protects you.

Good RAMS are a habit, not a one-off. Build the templates once, keep them current, and tailor them per job — and what felt like a barrier to commercial work becomes a routine part of quoting.

FAQs

What is the difference between a risk assessment and a method statement?

A risk assessment identifies the hazards on a job and the controls to reduce them. A method statement sets out the step-by-step safe sequence of how the work will actually be carried out. RAMS combines the two.

RAMS as a specific document aren’t named in law, but UK health and safety legislation requires you to assess and control risks, and recording that assessment is generally expected if you employ people. Commercial clients and principal contractors often require formal RAMS as a condition of working on site. Check current HSE guidance for your situation.

Who is responsible for writing RAMS?

The contractor or self-employed person doing the work usually produces their own RAMS for their part of the job. On larger sites, the principal contractor coordinates everyone’s RAMS but doesn’t write yours for you.

How long does it take to write RAMS?

Starting from scratch can take an hour or more, but with a reusable template for each job type you can tailor a tidy RAMS pack in a few minutes. Building that template library once is the time-saver.

Complete Tool’s AI RAMS generator drafts a job-specific risk assessment and method statement in seconds, which you then review and sign off rather than writing from a blank page.

One tool for the whole job. Start the next one on Complete Tool.

Full platform, 7 days free, no card needed. Set up in an afternoon, import your customers in a few clicks, and send your first quote today.

Founding members: first 100 businesses get 50% off every paid plan, for as long as they stay subscribed.